Do I need an acoustic report to build in a transport noise corridor in Queensland?
Not always. A new home in a Queensland transport noise corridor has to meet the Queensland Development Code (QDC) part MP 4.4, but the code lets you read the noise category off the government mapping and build to the constructions it lists, with no acoustic report. An assessment is worth getting when the mapped category is high, the design doesn't fit the listed constructions, when there is solid fencing or noise barriers that block the noise, or when the house would shield its own rooms from the road. Below we go through how to check a site, what each category means for the design, and when a report pays for itself.
When QDC MP 4.4 applies
It depends on three things: whether the site is in a corridor, the noise category, and the building.
1. The corridor
Transport noise corridors run beside state-controlled roads, railways, and council roads that a council has designated. To check a property:
- Open the State Planning Policy Interactive Mapping System (SPP IMS) from the Queensland Government's planning mapping page.
- On the Layers tab, open Information Purposes, then Transport Infrastructure.
- Tick "Noise corridor - State-controlled road (MANDATORY area)", the VOLUNTARY area layer below it, and "Transport noise corridor - Railway".
- Find the property on the Search tab and read the noise category where the building will sit.
- Check the council's planning scheme mapping too. The state map covers state-controlled roads and railways only, and says to refer to the relevant planning scheme for local corridors. Logan and Redland have designated their own roads, and Brisbane's City Plan 2014 maps noise categories along council roads. What is a transport noise corridor? lists where to find each council's map.
The free check reads the same state mapping, and the Brisbane, Logan and Redland council overlays, for any Queensland address. It shows the category at the pin and draws the corridors around it, so you can see how the category changes across the block.
State road corridors have a mandatory area and a voluntary area. In the mandatory area MP 4.4 must be met. In the voluntary area it's the owner's choice. Railway corridors are all mandatory.
2. The noise category
Every part of a corridor has a noise category from 0 to 4. Category 0 has no requirements, so a site that's wholly in category 0 needs nothing extra. From category 1 the requirements rise with each step. If the block sits across two categories, each applies to the part of the building inside it, so where the house sits on the block matters.
3. The building
QDC MP 4.4 applies to Class 1 to 4 buildings, and within them to habitable rooms. In practice that means:
- a new house, including a knock-down rebuild
- townhouses, units and apartments
- a secondary dwelling (granny flat)
- boarding houses and short-term accommodation
- an alteration or addition, for the part of the building it covers. Ask your certifier how they'll apply the code to your project.
Relocated buildings are excluded. Garages, carports, decks, bathrooms and laundries aren't habitable rooms and aren't affected.
What it means for the design
MP 4.4 doesn't stop a home being built in a corridor. It sets a minimum sound insulation rating, Rw, for the glazing, external walls, roof, floor and entry doors of each habitable room, and lists constructions that meet each rating. Typically:
- Category 1. Close to standard construction. A clad timber or steel framed wall with 13 mm plasterboard inside is accepted. Rooms with more than 1.8 m² of glass need acoustically rated seals around the windows and glazed doors.
- Category 2. Laminated glass: 6.38 mm, or 10.38 mm where the room has more than 1.8 m² of glass. The walls the code lists are all masonry or concrete, such as insulated brick veneer. Roofs need insulation over the ceiling, floors a 100 mm concrete slab or the insulated timber floor the code describes, and the entry door is solid core with acoustic seals.
- Category 3. Glazing goes to 10.38 mm laminated, or 14.38 mm laminated or double glazing for rooms with more than 1.8 m² of glass. Walls are cavity brick with insulation or render, insulated brick veneer with 13 mm plasterboard, or 150 mm dense concrete block.
- Category 4. Double glazing with a 100 mm air gap, double brick walls at least 270 mm thick in total, a 150 mm concrete slab, and a ceiling of acoustically rated plasterboard.
The glazing is usually the largest cost, and large sliding doors the hardest part. A design with a wall of glass facing the road at category 3 or 4 is the case where it pays to look at the options early. What is a transport noise corridor? has the full table of ratings.
When you can do without a report
If the mapped category is 0, there's nothing to assess. At category 1 or 2, a designer or builder can read the ratings from Schedule 1 of the code, pick constructions from Schedule 2, and show them on the drawings for the certifier.
When an assessment is worth getting
- The mapped category is 3 or 4, where the listed constructions are expensive and limit the design. In some cases it can be worth getting a site-specific assessment for mapped category 2 developments, especially if there are lightweight walls or large areas of glazing.
- The design uses lightweight clad walls at category 2 or above. Every wall the code lists there is masonry or concrete, so a framed wall needs a tested system or an engineer's assessment.
- The house, a neighbouring building, a solid fence or a noise barrier stands between the road and some of the rooms. The mapping applies a category to the whole building, ignoring the shielding from noise barriers/fences and the building itself. A site-specific noise assessment gives each room its category based on detailed modelling considering orientation to the road, and usually results in a lower category applying to some rooms.
- The building sits across two or more mapped categories and the certifier wants each room's requirements set out.
- The products you want to use aren't in Schedule 2 and you need to know whether their test ratings are enough.
- The certifier or a condition of the development approval asks for one.
Why a site-specific noise assessment often lowers the requirements
Schedule 3 of the code lets a suitably qualified person predict the noise at the building and set the category from the result. Each category is a 5 dB band, and a house commonly shields its own rear rooms by more than that, so bedrooms and living spaces at the back, facing away from the road, often come out one or two categories below the mapped one. Dropping from category 3 to category 2 takes a large room's glazing from 14.38 mm laminated or double glazing to 10.38 mm laminated, and the wall rating from Rw 47 to Rw 41.
The cost difference in glass and wall linings between categories can add up to tens of thousands of dollars difference even for a single house, while an acoustic assessment and report usually costs a few thousand at the most. So if a site-specific assessment shows lower categories than the mapping, it often pays for itself many times over.
However, the categories don't always come down. The mapping gives every storey the same category, and an upper storey that looks over fences and neighbouring roofs can sometimes come out the same or higher than the map shows. A good acoustic consultant will often know from experience when a site-specific assessment is likely to pay for itself or not when quoting for a job, and when it's better to just adopt the mapped categories.
What a site assessment involves
- For roads, a traffic noise model using the Calculation of Road Traffic Noise (CoRTN) method, with the road's traffic volume, heavy vehicle share, speed and surface.
- Traffic forecast at least 10 years ahead of the assessment date.
- The level at 1 m from the facade of every habitable room, with each storey assessed separately.
- A noise category for each habitable room and storey, and the ratings that follow.
Under Schedule 3, the model is also checked against noise measurements taken over at least 48 hours. The Department of Transport and Main Roads' Code of Practice leaves measurement to the engineer's judgement for a single house or small 2–3 lot subdivisions in the road noise corridor. Larger developments, or any development in a rail noise corridor, always require noise monitoring to validate the model.
Where it comes up in the approval process
MP 4.4 is a building code matter. The building certifier checks it when assessing the building development application, so the drawings need to show the noise category and the construction of each affected element, or come with an acoustic report that does.
Noise can also come up earlier. A development approval for a subdivision or a multiple dwelling near a state-controlled road or railway can include its own noise conditions, such as a noise barrier or a report at building stage. Those are separate from MP 4.4, and both have to be met.
Some common situations
For a single-storey house on a block backing onto a motorway, the rooms facing the road take the mapped category, and a site assessment will usually show the rooms on the other side of the house are lower.
For a two-storey house behind a noise barrier, the ground floor may be well shielded while the upper floor sees over the barrier. A site assessment gives each storey its own category.
For townhouses along a main road, the row facing the road shields the ones behind. The mapping doesn't take that into account, and a site-specific assessment does.
For a house beside a railway, the category comes from the maximum level of passing trains, and the same ratings table applies.
For a site that is also near an airport, aircraft noise is assessed separately under AS 2021. See When do I need an aircraft noise assessment?
How QuietPath helps
You upload your plans (site plan, floor plans and elevations; a window and door schedule helps) and confirm the address. A Resonate acoustic engineer works out the noise category for each habitable room, marks up the drawings to show what each window, wall, roof, floor and door needs, and lists the constructions that meet it. Where a site assessment would lower the requirements, we'll tell you before you decide. Approving the building work is always up to your building certifier.
Sources
- Queensland Government, Queensland Development Code MP 4.4 Buildings in a transport noise corridor, version 1.1, 17 August 2015, Schedules 1 to 3. Available from Business Queensland.
- Business Queensland, Transport noise corridors.
- Department of Transport and Main Roads, Transport Noise Management Code of Practice, Volume 1: Road Traffic Noise, 2013, chapters 4 and 8.
- Department of Transport (UK), Calculation of Road Traffic Noise, 1988.